A monitoring camera beside a road or bridge may use little electricity, but it still needs power every hour of the day. In Benxi, Liaoning, the inspection equipment was installed at an exposed roadside location, away from a convenient utility connection. The project description says the system was put in place in June 2026, using a 150 W solar module and an 80 Ah battery.

Field image provided with the Benxi project information.
The monitoring points are spread along roads and bridges. According to the project account, crews had been making repeat visits to check or replace batteries. That arrangement meant long inspection routes and, in poor weather, more difficult roadside work. A local solar supply offered a way to keep the monitoring equipment powered without running a new utility cable to the point.
Designed around an exposed northern site
Benxi's winter cold was a central consideration in the project description. The location is outdoors, with no building to moderate temperature swings and no shelter from wind or summer sun. Battery capacity and charging behavior can change with temperature, so the choice of battery, controller settings and enclosure conditions matter as much as the panel rating.
The installed arrangement described by the source consists of a 150 W PV module on a pole support, an 80 Ah battery, a smart controller and an outdoor cabinet. The panel angle was selected with winter sunlight and possible snow coverage in mind. The controller manages charging and power supply to the camera and wireless communications equipment. The project information mentions overcharge and over-discharge protection, along with remote access for checking generation, remaining battery level and system alerts.
The source material does not name the battery chemistry, controller model or system voltage. It also does not give the camera's power draw or a measured autonomy figure. Those details would be needed to reproduce the design or assess how long the system can operate through a particular stretch of poor weather.
What the project account reports
The company's case description says the monitoring equipment stayed online through rain, snow and low temperatures. It also reports complete collection of monitoring data during the reported period. The material provided does not include the length of that period, uptime logs or independent test records, so the result should be read as the project account's reported outcome.
There is also a practical change in how the site can be maintained. Operators can check system status remotely before dispatching a crew. That does not remove the need for physical inspection, but it may help avoid routine trips when the equipment is operating normally. The project description presents reduced battery replacement visits and less roadside maintenance as the main operational benefits.
What to check before using the same approach elsewhere
A 150 W panel and 80 Ah battery are the values used for this monitoring point; they are not a standard recipe for every camera site. Before applying the approach to another bridge, road or slope-monitoring location, an engineer would need the equipment's measured daily consumption, startup demand, local winter solar conditions and required backup period. Battery charging limits at low temperature, enclosure ratings, panel exposure to snow and shading, and access for maintenance should also be confirmed.
These checks are particularly relevant for unattended systems. If the monitoring link itself is critical, the power design should account for the longest likely low-sun period and define how operators will be alerted before the battery reserve is exhausted.
Related system information
SIY Solar's pages on off-grid DC solar systems, energy storage batteries and solar inverters describe equipment categories that may be relevant to remote power projects.
Discuss a remote power requirement
For product or system enquiries, contact SIY Solar with the project location, connected load and expected backup duration.
This article is based on project information supplied by Shandong Tanyue IoT Technology Co., Ltd. Equipment details and reported results should be checked against the project's technical records.